The reactor body for the Belarusian NPP manufactured at the Izhorskiye Zavody PJSC started to its destination.  5 days was required to deliver the reactor vessel from the Izhorskiye Zavod pier by water to Veliky Novgorod.

At the wharf in Veliky Novgorod, a valuable cargo was shipped from the barge to the shore by the most modern method of RO-RO with the help of the Cometto self-propelled vehicle.  That same night the reactor vessel was delivered to the railway station.  The length of the reactor vessel is 11 meters, weight 346.5 tons.

The next stage of transportation by rail.  Experts believe that the most difficult part of transportation lies ahead: loading and accurate positioning of the reactor vessel with respect to the rigging of a specialized railway.  conveyor.  This experience is already available in the engineers of SC “Spetstyazhavantans”.  This is the third reactor, which they deliver to Belarusian nuclear power engineers.

The loading will be carried out using the SBL lifting equipment and the Cometto modular traffic system.