“SPETSTYAZHAVTOTRANS” GROUP OF COMPANIES OFFERS TRANSPORT AND LOGISTICS SERVICES FOR RUSSIAN AND FOREIGN COMPANIES WORKING IN OIL AND GAS PROCESSING, CHEMICAL, ENERGY AND OTHER INDUSTRIES

  • Research and choosing an optimal route
  • Development of shipment logistic projects
  • Transport infrastructure engineering and building
  • Customs support

Major shipments and construction works

2021

Amur GPP

  • Cargo transportation to the Amursky gas processing plant: 51 units of heavy oversize equipment. The heaviest cargo – Column UUA 1 5-40-42 CR-001, weighing 866400 tons.

Rosatom State Corporation

  • Delivery of a reactor vessel and 4 steam generators from production facility of Atommash branch of AEM Technologies JSC to a specialized pier in Volgodonsk. The equipment is intended for Ruppur NPP in the Republic of Bangladesh. Dimensions of oversized equipment:

– Reactor vessel: weight – more than 347 tons, length – 1145 cm, width – 570 cm, height – 535 cm;

– Steam generator: weight – over 333 tons, length – 1412 cm, width – 570 cm, height – 526 cm;

Shchekinoazot Chemical Company

  • Delivery and unloading of 630 tons of equipment for Shchekinoazot on a temporary berth. Among the cargoes are an ammonia synthesis column and a pool-type reactor. Cargo dimensions:

– Ammonia synthesis column: weight – 270 tons, length – 19.5 m, width – 4.5 m, height – 4.2 m;

– Pool-type reactor: weight – 360 tons, length – 31 m, width – 5,7 m, height – 5,4 m;

Kursk NPP-2

  •  Delivery of Liebherr crane LR11350. The total weight of cargo – 1755 tons. The crane was carried disassembled into 136 pieces. The heaviest unit – crane crawler with driving gears weighing 39500 kg. The longest unit – the crane’s boom section, which was 12 meters long.

Kronshtadt Marine Plant

  •  Delivering a 300-tonne rowing electric motor from the Ruselprom plant to a storage place at the Kronshtadt Marine Plant for the scheduled replacement of one of the Arktika nuclear-powered icebreaker engines.

PAO NOVATEK 

  • Delivery of 6 vehicles with equipment to Ust-Luga

2020

Amur GPP

  • Transportation of cargos to the Amur GPP: 17 units of heavy oversized equipment with a total weight of 1,873,433 tons

 

Rosatom

  • Transportation of the reactor vessel and 5 steam generators from the production facility of the Atommash branch of AEM-technologies JSC to the specialized berth in Volgodonsk.

 

UCC Shchekinoazot

  • Transportation of three absorption columns and two ammonia oxidation reactors with a total weight of 440 tons.

 

LLC “Navinia Rus”

  • Transportation of a fractionating column weighing 237 tons (48.5 x 7.4 x 6.2 m) and 4 coking chambers weighing 254 tons (32.6 x 8.8 x 8.6 m).

 

OJSC Severneftegazprom

  • Delivery of 100 vehicles with equipment with a total weight of 940 tons to the Yuzhno-Russkoye field.  The transportation distance was approximately 3,600 km.

 

LLC LIVAM-GROUP

  • Transportation of deisobutanizer from KSC-6 of OJSC Volgogradneftemash in Volgograd to the birth of UTKO OJSC Volgogradneftemash.

2019

Amur GPP

  • Works on the design and arrangement of transport infrastructure in order to transport large-sized heavy equipment for the PJSC “Nizhnekamskneftekhim”
  • Transportation of cargoes to the Amur GPP: 54 units of heavy oversized equipment with a total weight of 5432.6 tons

 

LLC PAVIR

  • Delivery of cargos on separate requests
  • Delivery of Cargo (Truck crane) along the route: Dorogobuzh, Smolensk region – Velikiy Novgorod

 

Lazurit Cental Design Bureau JSC

  • Development of technical documentation for road and air transportation of a self-propelled deep-sea vehicle

 

LLC LIVAM-GROUP

  • Transportation of equipment along the route Eva-Yakha – warehouse of Achimgaz JSC

2018

Amur GPP

  •  Transportation of equipment to the Amur GPP: 79 units of oversized heavy equipment, with a total volume of over 60 thousand freight tons.

 

Afipsky Oil Refinery LLC

  •  Transportation of 56 pieces of equipment with a total weight of 6,000 tons.

 

MAVEG Industrieausrustungen GmbH

  •  Organization services:

 

– Shunting operations of the barges (tug Antey 2 and barge 7203) in the seaport of Novorossiysk during the transshipment of cargo from a sea crane vessel to barge 7203;

– Parking in the seaport of Novorossiysk.

 

Baltic Shipyard

  •  Loading of propeller motors (3 pcs.), Metal water protection tanks (2 pcs.), RITM 200 reactor plant (2 pcs.)

 

RoTEK LLC

  •  Transportation of cargo by road (Turbine generator stator) on the construction site of Novovoronezh NPP-2. Transportation distance – 1.6 km.

 

PJSC ZiO-Podolsk

  •  Transportation of 2 PGV-1000M through the territory of ZIO Podolsk from facility No. 30 to checkpoint No. 3.
  • Organization and implementation of services for unloading the PGV 1000M steam generator from the articulated conveyor TSCH-400

 

PJSC Power Machines

  • Organization of transport and forwarding services for the stator

2017

Belarusian NPP

  •  Transportation of 13 pieces of equipment (a separator weighing 44 tons, a steam heater of the 1st stage – 76 tons, asteam  of the 2nd stage – 99.5 tons, A separator collector – 28 tons) to the Belarusian NPP for the second power unit.

 

MAKS-2017

  •  Transportation of the legendary IL-2, weighing 5 tons, to participate in the MAKS-2017 international air show.

2016

CJSC NPO NATEK-Neftekhimmash

  • Transportation of separation tanks from the Taganrog Mechanical Plant to Nizhnekamsk for the modernization of PJSC TATNEFT

 

JSC AEM-Technologies

  • Multimodal transportation of the reactor vessel to the construction site in Ostrovets for the first power unit of the Belarusian nuclear power plant (weight 337 tons, length – 11.3 m, diameter – 4.8 m)

 

PJSC “FGC UES”

  • Transportation of heavy equipment (CSR, autotransformers, transformers with a total weight of 745 tons) from the Korotchaevo railway station to the construction site of “Substation 220kV Ermak”).

2015

  • Multimodal transportation of a reactor vessel for the first unit of the Belarusian nuclear power plant
  • Water transportation of the floating dock “Sviyag” for the Zelenodolsk Plant named after A.M. Gorky
  • Transportation of the oversized equipment for construction of the Tatneft aromatics complex
  • Transportation of adsorption towers from Volgogradneftemash berth to the installation site of the Kazachya compression unit
  • Transportation of a vacuum tower (d=10 m) and other oversized equipment for the Afipsky Refinery

2014

  • Transportation of 12 equipment units for the Deep conversion unit for heavy waste of TAIF-NK PSC
  • Development of design documentation for reconstruction of berthing facilities for oversized and overweight equipment transportation on the territory of the Deep conversion unit for heavy waste of TAIF-NK PSC
  • Design of the route for oversized and overweight equipment transportation form a dock section on the river Kama and a Transkam berth to the installation site of the Deep conversion unit for heavy waste of TAIF-NK PSC
  • Fractionating column, high pressure amine absorber, cold high pressure vapour separator for TAIF-NK PSC
  • Oversized equipment transportation and relocation for the Syzran Refinery
  • Stabilizer towers for Kinef, LLC (Kirishi)

2013

  •  Transportation and installation of 4 reactors weighing up to 1,306 tonnes for the Achinsk Refinery

2012-2013

  •  Reactors weighing up to 1,300 tonnes for the Rosneft Tuapse Refinery

2011-2012

  •   Rotor wheels for the Sayano–Shushenskaya Dam

2006-2012

  •  Oversize and overweight equipment for TANEKO, OJSC

2010

  •   Equipment for Gazprom Portovaya compressor station

2009

  •  800-tonne reactors for LUKOIL-Nizhegorodnefteorgsintez, LLC

2008

  •  350-tonne reactors for Nizhnekamskneftekhim, OJSC

2006-2010

  • Equipment for the Vyksa smelter
  • Metal structures and cars for the Kazan subway
  • Equipment for the Nord Stream project

1978-2005

  • Turbines, generators, transformers for Bureya, Kolyma, Krasnoyarsk and other dams
  • Reactors and columns for Prikumsk plastics plant, Tobolsk petrochemical plant, Nizhegorodnefteorgsintez, Tomsk petrochemical plant, refineries in Omsk, Yaroslavl, Baku, Grozny and other enterprises
  • Reactors for Novovoronezh and Zaporizhia nuclear power stations, and Gorky Nuclear Heating Plant
  • Spacecraft “Buran” for the Rocket and Space Corporation “Energia”