SPETSTYAZHAVTOTRANS DEVELOPS PROJECTS IN FULL COMPLIANCE WITH THE REQUIREMENTS OF CUSTOMERS, THE GENERAL BOARD OF STATE EXPERT REVIEW, ROSTECHNADZOR, INDUSTRIAL AND ENVIRONMENTAL SAFETY:
- Market research and economic risks analysis;
- Feasibility study;
- Basic design;
- Investment feasibility study;
- Basic and detailed design documentation;
- Designer supervision
MAJOR PROJECTS
2021
LLC RusGasAlliance
- Logistic scheme of the equipment delivery to the construction site of the gas-chemical complex CPECG;
- Development of the basic concept of delivery of oversized heavyweight equipment and materials to the construction site;
- Determination of the amount of capital costs for reconstruction of transport infrastructure (berthing facilities, roads, railways, and temporary storage sites, and construction of a new one);
- The concept of the construction of the transshipment point.
Balakovo NPP
- Working documentation for manufacturing of auxiliary equipment used during dismantling of crane K2x100/190;
- Technical documentation for rendering services and performance of works on preparation of route and transportation of large-sized radioactive metal waste accumulated in Rosatom State Corporation.
Nornickel
- Technical proposal for installation of heat exchangers at Nadezhda Metallurgical Plant.
2020
JSC NIPIGAS
- Design work on the capital construction object “Gas processing complex as part of the Ethane-containing gas processing complex near the Ust-Luga village”
Gazpromneft-MNPZ
- Design work and implementation of field supervision at the facilities the Refinery
2019
PJSC “Nizhnekamskneftekhim”
- Development of working documentation “Technical re-equipment of the units of the flare unit R-16 of facility No. 1421 of the divinyl and hydrocarbon plant
MT RUSSIA LLC
- Completion of working documentation for the Amur GPP
Gazpromneft-MNPZ
- Technical re-equipment of part of the FTL building for archival premises for storing documentation
- Biological treatment facilities. Output of permeate from the reverse osmosis unit into the chemically treated water network
2018
PJSC “Nizhnekamskneftekhim”
- Installation of a scheme for transferring the discharges of the spring-safety valve of the equipment to a candle at the Central Gas Fractionation Unit-1 facility No. 1417 of the divinyl and hydrocarbon plant
TECNIMONT RUSSIA LLC
- Design services for the construction of the Amur Gas Processing Plant
Gazpromneft-MNPZ
- Performing adjustments to the Design documentation for the facility: “Diesel fuel inventory”
- Development of design and working documentation for the facility: “Changing the scheme for receiving raw materials and pumping out finished products from the MTBE production unit with the installation of three new raw materials tanks (E-113, 114, 115)”
2017
Gazpromneft-MNPZ
- Completion of the development of working documentation for the replacement of power boilers at the sulfur production unit
- Completion of the development of working documentation for the technical re-equipment of the heat supply system of the sulfur production unit
- Completed the development of design documentation for a unified control room and process control center
- Completed the development of design documentation for a methanol warehouse with a discharge rack
- Completed the development of design documentation for a methanol warehouse with a discharge ramp (the documentation was submitted to Federal autonomous institution “Main Department of State Expertise”)
PJSC “Nizhnekamskneftekhim”
- Completion of the development of working documentation for the reconstruction of the railway overpass for unloading isobutane and a scheme for receiving isobutane from the unloading overpass
- Development of design and working documentation for the construction of a loading and unloading rack for loading n-butane
- Development of working documentation for the transfer of the discharge of the safety valves of the Central Gas Fractionation Unit into a closed flare system
2016
PJSC “Nizhnekamskneftekhim”
- Completion of the development of working documentation for the construction of a unit for the purification of the C 10 fraction from amines of the unit for the purification of amines for the production of linear α-olefins. Joint work on the basic design by Linde (Germany)
- Development of working documentation for the reconstruction of a railway overpass for unloading isobutane and a scheme for receiving isobutane from an unloading overpass
- Development of design and working documentation for the construction of a loading and unloading rack for loading n-butane
Gazpromneft-MNPZ
- Completion of the project “Control room No. 8” (engineering surveys; design and working documentation)
- Completion of the development of working documentation for the replacement of 6 kV distribution substation RP-108
- Development of working documentation for the replacement of power boilers at the sulfur production unit
- Development of working documentation for technical re-equipment of the heat supply system of the sulfur production unit
- Working documentation for the connection of the administrative complex and warehouse of flammable liquids
- Development of design documentation for a methanol warehouse with a discharge rack
- Working documentation for the transfer of heat traces of the ЛЧ-24-2000 unit to the internal heating circuit
- Development of a project for a unified control room and a process control center (surveys, design and working documentation)
- Completed the development of working documentation for the technical re-equipment of electrical equipment
- Replacement of the lighting network for indoor switchgear-110 kV GPP-1
- Replacement of oil-filled bushings in ERU-110 kV, 18 pcs. GPP-1 “
- Replacement of equipment for high-frequency protection channels on two 110 kV overhead lines in 110 kV switchgear, bringing up to operational blocking standards for GPP-1
JSC Syzran Refinery
- Development of working documentation for the installation of shut-off valves on the CDU/VDU-6 unit on of a floating transport dock “Sviyag” from Zelenodolsk to Severodvinsk
AEM-technology, OJSC:
- Development of projects for road and water transportation, unloading and lateral movement of a reactor vessel for the first unit of the Belarusian nuclear power plant; designer supervision during projects implementation
2015
Deep conversion unit for heavy waste by TAIF-NK PSC:
- Development of design documentation and design supervision during a sulfur recovery unit construction at TAIF-NK PSC
Control room for production unit 8 at Gazpromneft-MNPZ:
- Engineering survey and development of the complete set of basic and detailed design documentation
Nizhnekamskneftekhim, PJSC:
- Detailed design documentation for the project “Reconstruction of the linear alpha olefins production with the capacity of 37,500 tonnes a year using the α-Sablin process”; a unit for amine treatment of C10 fraction
Syzran Refinery, OJSC:
- Detailed design documentation for the project “Technological units and site utilities”; instructions of regulatory authorities
Afipsky Refinery, LLC:
- Development of a special project for oversized and overweight equipment transportation and designer supervision during its implementation
Volgogradneftemash, JSC:
- Design documentation for the construction of a berth for oversized and overweight equipment loading/unloading
Zelenodolsk Plant named after A.M. Gorky, PHC:
- Development of the project for transportation of a floating transport dock “Sviyag” from Zelenodolsk to Severodvinsk
AEM-technology, OJSC:
- Development of projects for road and water transportation, unloading and lateral movement of a reactor vessel for the first unit of the Belarusian nuclear power plant; designer supervision during projects implementation
2014
Deep conversion unit for heavy waste by TAIF-NK PSC:
- General plan development
- Unit roads construction project
- Sulfur recovery unit — participation in a KNM Group Bergad project
- VCC unit — participation in a Toyo Engineering project
- Development of design documentation for recovery of berthing facilities for oversized and overweight equipment transportation on the territory of the unit
- Design of the route for oversized and overweight equipment transportation form a dock section on the river Kama and a Transkam berth to the unit installation site
Nizhnekamskneftekhim, PJSC: Detailed design documentation for the construction of an amine treatment column unit for linear alpha olefins production
2006-2013
Deep conversion unit for heavy waste by TAIF-NK PSC:
Design and survey works for the second construction stage; development of basic and detailed design documentation
Sibur-PETF, OJSC (Tver): Development of design documentation.
Rosenergoatom Concern, OJSC:
- Development of a standard design solution by implementing GOST 22689.Х-89 and using software programs SP3D, SPRD
- Creation of standard processes for metal structures design and transferring the results to the project owner as an information model according to the valid regulatory system
- Scientific support of events targeted at the implementation of the information technologies for supporting lifecycle of nuclear power plant units
- Development of the solution for creating a standard information model of nuclear power plant lifecycle that will reflect the current level of unit lifecycle management system, particularly in terms of harmonization of the national standards, regulations and technical documentation with international standards
- Development of the specification for Atomsmeta software modification in order to integrate it with Intergraph SPF and the planning system
- Development of a standard decision making algorithm for supports placement during space arrangement using SP3D, SPF and a strength analysis system
Special Systems & Technologies, LLC:
Development of design documentation for the producer of cables and cable products (second construction stage).
Ryazan Oil Refining Company, CJSC: Detailed design documentation for reconstruction and re-equipment of the company units including:
- Equipping the compressor of a sulphuric acid alkylation unit with a smooth-start system
- Elimination a sulphuric acid alkylation unit from a technological scheme of the fluid catalytic cracking unit
- Replacing rotary screw air compressors of the fluid catalytic cracking unit
- Ensuring the compliance of the tank farm with the industrial safety rules.
Moscow Refinery, OJSC:
- Basic and detailed design documentation for a steam boiler room with a condensate cleanout assembly for an isomerization unit
- Design documentation for site utilities (operator and control rooms, industrial parks and stock tanks), such units as diesel hydrotreater LCh-24-2000, naphtha hydrotreater, catalyst cracker, hydrogen production plants; design documentation for a short-cycle adsorption unit for reformers. Architectural and building solutions
- Basic and detailed design documentation for a light naphtha isomerization unit. Architectural and building solutions
- Design documentation for service bridges between sites
- Local central operator room for the isomerization unit.
Atyrau Refinery, LLP:
- Setting allowances for oil and oil products loss at the refinery production units
- Setting allowances for fuel burning during production
- Setting allowances for oil and oil products loss at the site utilities
- Development of the action plan for decreasing oil and oil products loss and fuel burning for process needs
NAFTATRANS Refinery, CJSC: S
pecific Technical Specification (STU) for design, construction and operation of a flare system, a fume stack (h=150 m) of the sulfur recovery unit and a fume stack (h=100 m) of the heating power plant
Salavatnefteorgsintez Refinery, OJSC: Design documentation for carbon dioxide and hydrocarbon flare stacks and a fume stack of an ELOU-AVT-6 unit.
Refining and Petrochemical Plants Complex, TANECO, OJSC:
- Detailed design documentation for the facilities of the aromatics complex feedstock park: pump house, tank farm, fuel gas supply system
- Detailed design documentation for service bridges between sites
- Detailed design documentation for a fume stack (h=150 m) of a hybrid sulfur recovery unit
- Detailed design documentation for a toxic industrial waste dump
- Basic and detailed documentation for five amenity buildings with canteens, a heated parking lot for plant transport and a laundry
- Development of detailed design documentation for a controller room and a piperack of a 3000 section of a hybrid hydrocracking unit
- Development of detailed design documentation for pump feeding of additives to kerosene and diesel; firefighting pump station with water tanks for a deep conversion plant